Cloud migration: moving your servers to the cloud without bringing the business to a halt

Cloud migration does not have to be a leap in the dark. Careful assessment, a phased approach, testing with real users and a clear view of what should stay on site.

8 min readGiorgio Monticelli

A cloud migration of business servers can be done without bringing the company to a halt, provided it follows a method: a thorough assessment of systems and dependencies, a reasoned choice of what to move and what to keep on site, a phased move with early data replication and a rollback plan, and testing by the people who actually use the systems. That way each step needs short, agreed windows rather than days of disruption.

Many companies postpone the project for an understandable reason: the business application, email, shared files and production software are the core of daily work. Here is how to approach a migration that keeps the business running.

Can you migrate to the cloud without stopping the business?

Yes, you can migrate to the cloud without stopping the business, because most of the work happens before the actual switch, while current systems keep running. Data is copied to the new environment in advance and kept in sync; the cut-over itself comes down to a final synchronisation and checks, carried out in the evening or at a weekend.

The risk lies not in the cloud itself but in improvisation: migrations done all at once, without mapping dependencies, without testing and without a way back. That is where downtime comes from.

What should you assess before a cloud migration?

Before a cloud migration, assess applications, dependencies, licensing, performance and data requirements. You cannot move well what you do not know well, and the inventory goes beyond a list of servers.

  • Applications and dependencies: which program uses which database, which services talk to each other, which scheduled jobs run overnight. Migration surprises almost always come from a connection nobody remembered.
  • Licensing: some software is tied to the hardware it runs on or has specific terms for cloud use. Check with vendors beforehand, not afterwards.
  • Performance and usage: how many resources are really needed, at what times and with what peaks. Sizing the cloud on the current server, often either oversized or at its limit, leads to overspending or sluggish systems.
  • Data and requirements: what data is processed, where it needs to reside and which retention and protection obligations apply. Choosing data centres within the European Union simplifies many GDPR considerations.
  • Costs over time: in the cloud you pay for what you use. The comparison with your current infrastructure should cover several years, including hardware renewals, maintenance, energy and time spent on management.

Which servers should move to the cloud and which should stay?

Move the systems that gain a real benefit from the cloud; keep on site whatever must work without a connection or is unsuitable for the cloud. For each system there are, broadly, four options:

  • move it as it is to a cloud virtual machine, the quickest route for applications that work well and need no changes;
  • adapt it, for instance by moving a database to a managed service, to reduce maintenance work;
  • replace it with a ready-made cloud service, when the current software is at end of life and better alternatives exist;
  • keep it on site, when there are good reasons to do so.

What stays on site, and why

The cloud is not a goal in itself, and a good migration knows when to say no. Some components belong close to the people who use them: the local network, firewall, Wi-Fi and printers, of course, but also systems that control machinery and plant, which must keep running if the connection drops, applications that need very low response times and software that is unsuitable for the cloud for licensing or technical reasons. Often the end result is a hybrid environment, and that is as legitimate a choice as moving everything out. Our cloud services start from exactly this assessment, system by system.

What connection do you need after the migration?

After the migration you need a connection sized for traffic to the cloud and an independent backup line, because the office internet line becomes the road to work. Where today a slow connection means slower browsing, tomorrow it will mean not being able to open the business application.

Before migrating, check the line's capacity by measuring real traffic, and put a second line in place on a different technology or provider, with automatic failover. The link between office and cloud must be encrypted and stable, and the same applies to remote staff. A LAN and WAN designed for the new set-up avoids bottlenecks nobody had anticipated.

How does a phased migration work?

A phased migration moves one system at a time, starting with the least critical and checking each step before the next. The typical sequence is:

  1. Prepare the cloud environment: network, security, access and backup, before moving any data.
  2. Run a pilot with a secondary system, to validate procedures, performance and timings on a real case.
  3. Replicate data early: data is copied to the new environment in the days beforehand and kept in sync.
  4. Agree a short cut-over window, in the evening or at a weekend, communicated to staff well in advance.
  5. Check immediately with key users that everything works.
  6. Keep a rollback plan ready: if something goes wrong, you return to the previous system, which stays available until the new one is signed off.
  7. Move on to the next system, applying what you have learned.

How do you know the migration has succeeded?

A migration is confirmed by functional testing from the people who use the systems every day, alongside technical checks on performance, security and backup. Those who moved the systems know the servers respond; only those who use them know whether everyday work runs smoothly.

  • Functional tests: key users try their daily tasks, from printing and delivery notes to exports and links with other software.
  • Performance: response times at peak hours, compared with before.
  • Security: access, permissions, firewall rules and multi-factor authentication for administration.
  • Backup and restore in the new environment, which should never be taken for granted. The cloud provider guarantees the infrastructure, not the protection of your data against deletion or ransomware, which needs designing as part of a backup and disaster recovery plan.

What should you do after a cloud migration?

After a cloud migration, the environment needs looking after: monitoring, cost control, updates and periodic resource reviews. Cloud costs depend on usage, and resources left running or oversized add up every month. Retired servers should have their data securely erased before being disposed of or reused, and documentation should be updated to reflect the new set-up.

It is also worth scheduling a review with users a few weeks after the switch: it is the easiest way to pick up small issues nobody reports, such as slower printing or a link that needs reconfiguring, and fix them before they become accepted habits.

Moving servers to the cloud is also a chance to tidy up: retire what is no longer needed, document what remains and make the infrastructure simpler to run. Done carefully and to measure, a migration pays off over time precisely because it does not need doing twice.

If you are considering moving your systems to the cloud, let's talk: we can start with a review of your current infrastructure and plan a route that suits your business.

Frequently asked questions

How long does a cloud migration take?

It depends on the number of systems, the dependencies between applications and the amount of data to move. More important than the overall duration is the length of each cut-over, which early data replication can reduce to short windows outside working hours.

Can every server be moved to the cloud?

No. Some software has licences tied to hardware or is unsuitable for the cloud, and systems that control machinery or need very low response times often work better on site. The most common outcome is a hybrid environment.

What happens to data if the migration fails?

In a well-planned migration, the original system stays available until the new one has been tested and signed off. A written rollback plan sets out in advance how to go back, so a problem does not turn into downtime.

Where is data stored in the cloud?

The main providers let you choose the region where data is stored. Choosing data centres within the European Union simplifies GDPR compliance, but the contract, security measures and access management still need checking.

Do you still need backups once servers are in the cloud?

Yes. The provider looks after the infrastructure, but protecting data from deletion, mistakes and ransomware remains the company's responsibility. Backup needs redesigning for the new environment and restores need testing.

Giorgio Monticelli

About the author

Giorgio Monticelli

Technical director, VAY S.r.l.

No desk-bound manager: he is the heart of VAY’s technical work. He conceives and designs the solutions, and works in the field alongside technicians and clients, from the first analysis to the go-live.